Genigar Wastewater Treatment Institute

As part of the upgrade and expansion of Genigar sewage treatment facility, lines with diameters of 710, 400 mm with a total length of 10 km were laid connecting Genigar sewage treatment facility
to Afula sewage treatment facility.
The laying of the lines included many horizontal drillings and the crossing of streams, roads and railroad tracks.
The project was carried out under the ongoing professional supervision of the field service of Plassim.
The project was carried out for: Mei Noam Corporation
Piping type: Meiflex 710 mm grade 16 and Meriflex 400 grade 16
Line length: 10,000 meters
Operating contractor: Shaham Mekorot