Contact Us

Projects

Ofakim deviding line

Laying 16″ steel lines with a total length of 1,500 m including horizontal drilling with a diameter of 24″ under road 241.

Line connecting Hamat Gader station

On Ein Said St. – Laying of underground and overhead steel lines with a diameter of 20″ including intersections and crossings with a steel sleeve of 28″ diameter, dismantling of an old line and making specifications for piping.

Geniger Wastewater Treatment Institute

Carrying out earthworks and laying underground polyethylene piping in diameters 400 and 710 mm with a total length of 16,000 m including connections, specifications and sections.

METCO Photovoltaic System

Planning, procurement, construction, operation, service and maintenance of electricity production systems using photovoltaic technology with an aggregate power of approximately 2.2 megawatts (AC) on several roofs owned by the Gaon Group.

Wastewater treatment plant project – Alon Tavor

Wastewater treatment challenges valves’ manufacturers in dealing with corrosive fluids and gases.

Alon Tavor wastewater treatment plant is even more challenging due to its handling of industrial wastewater. It is therefore understandable that Hakohav valves are leading in the facility for years.

The project was carried out for: Palgei Maim

Water supply to the south – Gilat station project

Butterfly valves of large diameter, centric and double eccentric, were installed at the Gilat station in the project of thickening the water supply systems from the desalination plants to the Negev.

The ability to adapt models, construction materials and coatings – places Hakohav (Kim valves) at the top of the suppliers in the field.

The opposite national carrier (HaMovil) – Site Zalmon

 Hakohav company is proud to be a partner in a historic project – the opposite carrier to the Kinneret.

At the Zalmon site of Mekorot, 36″ diameter needle valves were installed that are used to regulate the flow and pressure of desalinated water to fill the Sea of Galilee through Zalmon river.

The project was carried out for: Mekorot

Operating contractor: Ofek Atarim 10

Air conditioning systems in Beser Towers – Petah Tikva

Centric butterfly valves and Hakohav filters were installed in the challenging water cooling systems used by the central air conditioning systems of the four Beser towers, a residential and commercial complex with dozens of floors each.

 

Tavor Reservoir Project – Restoring water for agriculture

Centric butterfly valves were installed at the outlet of the Tavor Reservoir as disconnecting valves in the filter batteries before supplying the water for irrigation in the fields.

The owner of the facility – Mekorot, and the companies that produce the filtration systems, know that you can trust the valves of Hakohav.

The project was carried out for: Mekorot

Operating contractor: Shlomo Haviv

Eastern conduit from Beit Shean to the Jordan Valley center

An eastern conduit from Beit Shean to the center of the Jordan Valley, the Tirzah Reservoir and from there the distribution of water for irrigation in the Jordan Valley.

Source of water: saline springs and Sea of Galilee water.

The project was carried out for: Jordan Valley Water

Type of piping: Trio-wrapped steel piping and internal coating with cement cement, in main diameters: 28″,32″,36″,40″

The length of the line: 70,000 meters

Neot HaKikar – Tzin Bridge – Ofarim Reservoir

An international project. Due to the large height differences and the large working pressure, pipes with a large wall thickness of 16 mm were required in the lower part of the line.

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 20″

The length of the line: 31,000 meters

Lines connecting water reservoirs – the Arava

A connecting line between Paran Reservoir and Tzofar Reservoir and a connecting line between Timna and Yotveta Reservoir.

In this line, 13.5 meter long pipes were laid for the first time.

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 32″

The length of the line: 30,000 meters

Shafadan Tal-or line – Habesor river park

The Shafadan Tal-or line to Magen is part of the transmission system of the third line to the Negev where treated water is flowed to irrigate the Negev.

The project was carried out for: Mekorot

The type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 68, thickness 9.5 mm and 12.7 mm

The length of the line: 7,100 meters

A connecting desalination line to Shraga reservoir – Western Galilee

A line connecting desalination line to Shraga reservoir is the first section connecting to the seawater desalination facility in the Western Galilee and establishing the water transmission system.

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel pipes, including sections of compression pipes, 80″ diameter

The length of the line: 6,000 meters

Karnei Shomron – Kidron river project

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 42″

The length of the line: 4,000 meters

Yarhiv station – Karnei Shomron

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement, diameter 40″, thickness 16 mm

Line length: 1,000 meters

Elkana – Barkan connecting line

Expanding the reliability of the water supply to the communities located in Mount Samaria.

Connecting the water supply in Samaria to the national water system.

The route of the mountainous terrain posed a great challenge to the water line installers.

The project was carried out for: Mekorot

Piping type:

Trio-wrapped steel piping and internal coating with cement cement diameter 28″

Line length: 10,000 meters

Water from Ha’Asi river to Merav fish pond – Kibbutz Shluchot

As part of regulatingthe supply of Ha’Assi river water to the fish ponds of Kibbutz Merav, a 710 mm level 5 mariflex line was laid, that will allow a regular and efficient supply of water to the fish.

The project was carried out for: Afikei Maim

Piping type: Meriflex 710 mm level 5

The length of the line: 1,500 meters

Operating contractor: S. Ruhi Ltd

Line connecting Nir Eliyahu Reservoir – drilling under road 6

The laying of the new line will enable the supply of sewage water to the farmers of Nir Eliyahu and the surrounding area.

Laying the new line involved precise horizontal drilling under Route 6.

Piping type: Meriplex 900 mm level 10

The length of the line: 700 meters

Operating contractor: Dikman Zvi and Sons

Drainage line Yuvalim: Nir Galim Interchange – Ashdod

In preparation for the construction of a new interchange at the Nir Galim intersection near the city of Ashdod, a drainage line with a diameter of 900 mm was laid.
The work included digging in sandy soil at great depth and horizontal drilling under road 41.
The project was carried out for: Yuvalim Ashdod Corporation
Piping type: Meriplex 900 mm level 10
The length of the line: 1000 meters
Operating contractor: S.i.K Water Infrastructures

Ministry of the Environment – Haifa Port

The Handicrafts Department at Plasim produced floats made from 1000 mm diameter Merika piping for classified use by the Institute for Biological Research.

The project was carried out for: the Institute for Biological Research

Piping type: Merikra 1000 mm

Operating contractor: Plasim Infrastructure

Connecting pumping station – threading a pipe in a steel sleeve – Atlit

In preparation for the expansion of a neighborhood in Atlit, works were carried out to establish sewage infrastructure in the neighborhood.
During the horizontal drilling, a steel pipe was driven at a very precise slope, inside which a Meriflex pipe with a diameter of 450 was threaded to transport the wastewater.
The project was carried out for: Ofek Etarim 10 Ltd
Piping type: Meriflex 450 mm level 10
The length of the line: 600 meters

Upgrading sewage lines – smashing method – Moshav Ramot

In a project to upgrade existing infrastructure in Moshav Ramot, an upgrade was made to the sewage pipes in the Moshav using a unique “smashing” method, that allows the renewal of pipes without digging.
The new 225 mm Meriflex type line allows upgrading, expanding and repairing lines without digging while maintaining a normal life routine.
The project was carried out for: Kolhei Golan
Piping type: Meriflex 225 mm level 10
The length of the line: 400 meters
Operating contractor: A.D. Edri Bros.

Copying line 42″- Beer Sheva

As part of the construction works being carried out at Ben Gurion University, Mekorot carried out the copying of the 42 steel line which runs along the route of the construction works.
The new 1200 diameter Meriflex line was welded by a team of skilled welders on behalf of Plassim Infrastructures.
The project was carried out for: Mekorot
Piping type: Meriflex 1200 mm level 10
The length of the line: 800 meters
Operating contractor: Shahm Mekorot

Desalination plant Sabaha Eilat

Project to upgrade and expand the “Sabaha” desalination plant in Eilat of Mekorot.
Our company installed ten riders with a diameter of 1200 for Ofek Atarim 10, which is carrying out the project.
The project was carried out for: Ofek Atarim 10 Ltd., Mekorot
Piping type: GF 1200-500 rider installation
Line length: 10 riders
Operating contractor: a team of Plassim welders

Brine line Intel-Ashkelon – Intel Kiryat Gat line

A new electronic chip factory was built at the Kiryat Gat Intel factory.
As part of the infrastructure preparation for the factory, a 450 mm diameter pipeline with a length of 15 km is laid between the Intel factory and the beach strip in Ashkelon.
The line is designed to absorb brine from the plant and transport it to the sea in drianage.
The project was carried out for: Intel
Piping type: Meriflex 450 mm level 16
The length of the line: 15,000 meters
Operating contractor: Ofek Atarim 10 Ltd

Migdal drainage line

In order to regulate surface runoff drainage in Migdal, a 1500 mm diameter Merikra pipe was laid throughout.
The work was carried out in a cell in an urban and dense area while maintaining the routine of life.
The project was carried out for: Kinneret Drainage Authority
Piping type: Merikra 1500 mm drain
The length of the line: 500 meters
Operating contractor: Yehezkel Morad

Establishment of an Intel chip factory in Kiryat Gat

A new electronic chip factory was built at the Kiryat Gat Intel factory.
As part of the preparation of the factory’s infrastructure, a 1200 diameter Meriflex pipe was installed that will be used to cool the advanced production systems in the factory.
The project was carried out for: Intel
Piping type: Meriflex 1200 mm level 10
The length of the line: 1000 meters
Operating contractor: Lasiko

Genigar Wastewater Treatment Institute

As part of the upgrade and expansion of Genigar sewage treatment facility, lines with diameters of 710, 400 mm with a total length of 10 km were laid connecting Genigar sewage treatment facility
to Afula sewage treatment facility.
The laying of the lines included many horizontal drillings and the crossing of streams, roads and railroad tracks.
The project was carried out under the ongoing professional supervision of the field service of Plassim.
The project was carried out for: Mei Noam Corporation
Piping type: Meiflex 710 mm grade 16 and Meriflex 400 grade 16
Line length: 10,000 meters
Operating contractor: Shaham Mekorot

Upgrading the main collector – Elad/Nachshonim interchange

Performing an upgrade to the main collector sewage line of the city of Elad, with a 1000 mm diameter pipe.
The project includes the laying of pipelines at great depth, including horizontal drilling under Route 6.
The project was carried out under the ongoing professional supervision of the field service of Plassim.
The project was carried out for: Arim Company
Piping type: Meriflex 1000 mm grade 10
The length of the line: 3,500 meters
Operating contractor: Mei Hamek 2000

Sewage line road 431 – Rishon Lezion

As part of works for the construction of a railway to Jerusalem, an upgrade was made to the main sewage line in Rishon Lezion to a 1000 mm diameter Merika pipe.
The pipeline weldings were performed by a qualified and skilled team on behalf of Plassim Infrastructures.
The project was carried out for: Meniv Rishon Corporation
Piping type: Merikara 1000 mm welding
The length of the line: 400 meters
Operating contractor: Shikun & Binui Solel Bone Menorah systems

This site is registered on wpml.org as a development site.