Upgrading the main collector – Elad/Nachshonim interchange

Performing an upgrade to the main collector sewage line of the city of Elad, with a 1000 mm diameter pipe.
The project includes the laying of pipelines at great depth, including horizontal drilling under Route 6.
The project was carried out under the ongoing professional supervision of the field service of Plassim.
The project was carried out for: Arim Company
Piping type: Meriflex 1000 mm grade 10
The length of the line: 3,500 meters
Operating contractor: Mei Hamek 2000