Projects
Geniger Wastewater Treatment Institute
Carrying out earthworks and laying underground polyethylene piping in diameters 400 and 710 mm with a total length of 16,000 m including connections, specifications and sections.
Carrying out earthworks and laying underground polyethylene piping in diameters 400 and 710 mm with a total length of 16,000 m including connections, specifications and sections.
visibility_offDisable flashes
titleMark headings
settingsBackground Color
zoom_outZoom out
zoom_inZoom in
remove_circle_outlineDecrease font
add_circle_outlineIncrease font
spellcheckReadable font
brightness_highBright contrast
brightness_lowDark contrast
format_underlinedUnderline links
font_downloadMark links