Projects
Brine line Intel-Ashkelon – Intel Kiryat Gat line
A new electronic chip factory was built at the Kiryat Gat Intel factory.
As part of the infrastructure preparation for the factory, a 450 mm diameter pipeline with a length of 15 km is laid between the Intel factory and the beach strip in Ashkelon.
The line is designed to absorb brine from the plant and transport it to the sea in drianage.
The project was carried out for: Intel
Piping type: Meriflex 450 mm level 16
The length of the line: 15,000 meters
Operating contractor: Ofek Atarim 10 Ltd