Projects
Drainage line Yuvalim: Nir Galim Interchange – Ashdod
In preparation for the construction of a new interchange at the Nir Galim intersection near the city of Ashdod, a drainage line with a diameter of 900 mm was laid.
The work included digging in sandy soil at great depth and horizontal drilling under road 41.
The project was carried out for: Yuvalim Ashdod Corporation
Piping type: Meriplex 900 mm level 10
The length of the line: 1000 meters
Operating contractor: S.i.K Water Infrastructures