Projects
Shafadan Tal-or line – Habesor river park
The Shafadan Tal-or line to Magen is part of the transmission system of the third line to the Negev where treated water is flowed to irrigate the Negev.
The project was carried out for: Mekorot
The type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 68, thickness 9.5 mm and 12.7 mm
The length of the line: 7,100 meters