Contact Us

Projects

Shafadan Tal-or line – Habesor river park

The Shafadan Tal-or line to Magen is part of the transmission system of the third line to the Negev where treated water is flowed to irrigate the Negev.

The project was carried out for: Mekorot

The type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 68, thickness 9.5 mm and 12.7 mm

The length of the line: 7,100 meters

This site is registered on wpml.org as a development site.