Contact Us

Projects

Line connecting Nir Eliyahu Reservoir – drilling under road 6

The laying of the new line will enable the supply of sewage water to the farmers of Nir Eliyahu and the surrounding area.

Laying the new line involved precise horizontal drilling under Route 6.

Piping type: Meriplex 900 mm level 10

The length of the line: 700 meters

Operating contractor: Dikman Zvi and Sons

This site is registered on wpml.org as a development site.