Projects
Neot HaKikar – Tzin Bridge – Ofarim Reservoir
An international project. Due to the large height differences and the large working pressure, pipes with a large wall thickness of 16 mm were required in the lower part of the line.
The project was carried out for: Mekorot
Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 20″
The length of the line: 31,000 meters