Projects
Establishment of an Intel chip factory in Kiryat Gat
A new electronic chip factory was built at the Kiryat Gat Intel factory.
As part of the preparation of the factory’s infrastructure, a 1200 diameter Meriflex pipe was installed that will be used to cool the advanced production systems in the factory.
The project was carried out for: Intel
Piping type: Meriflex 1200 mm level 10
The length of the line: 1000 meters
Operating contractor: Lasiko