Copying line 42″- Beer Sheva
As part of the construction works being carried out at Ben Gurion University, Mekorot carried out the copying of the 42 steel line which runs along the route of the construction works.
The new 1200 diameter Meriflex line was welded by a team of skilled welders on behalf of Plassim Infrastructures.
The project was carried out for: Mekorot
Piping type: Meriflex 1200 mm level 10
The length of the line: 800 meters
Operating contractor: Shahm Mekorot