Projects
Lines connecting water reservoirs – the Arava
A connecting line between Paran Reservoir and Tzofar Reservoir and a connecting line between Timna and Yotveta Reservoir.
In this line, 13.5 meter long pipes were laid for the first time.
The project was carried out for: Mekorot
Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 32″
The length of the line: 30,000 meters