Management of major flow infrastructure projects, water treatment and energy projects

As part of Gaon Group’s strategy of offering its customers turnkey solutions, including end-to-end undertaking of the project, GWS’s operations span several business fields.
The Company carries out turnkey projects in the flow infrastructure industry, in the water treatment, treated waste water handling, gas, and solar energy industries.
The Company is experienced in construction projects and long-term maintenance projects.
The Company relies on the advanced engineering capabilities of the Gaon Group Companies, while making the necessary adaptations for each project.

Management of major flow infrastructure projects, water treatment and energy projects

Main Lines of Business

Initiation and execution of projects in the fluid infrastructures industry: water, treated waste water, fuel and ga
Horizontal drilling
Initiation and construction of sewage treatment plants
Initiation and execution of polluted drilling water treatment facilities
Installation of fiber optic telecommunication infrastructures, etc.
Initiation and construction of treated waste water plants in collaboration with regional suppliers of treated waste water

Leading customers

Mekorot, water and sewage corporations, agricultural water associations, regional suppliers of treated waste water

Projects

Water supply to the south – Gilat station project

Butterfly valves of large diameter, centric and double eccentric, were installed at the Gilat station in the project of thickening the water supply systems from the desalination plants to the Negev.

The ability to adapt models, construction materials and coatings – places Hakohav (Kim valves) at the top of the suppliers in the field.

Water supply to the south – Gilat station project

Butterfly valves of large diameter, centric and double eccentric, were installed at the Gilat station in the project of thickening the water supply systems from the desalination plants to the Negev.

The ability to adapt models, construction materials and coatings – places Hakohav (Kim valves) at the top of the suppliers in the field.

The opposite national carrier (HaMovil) – Site Zalmon

 Hakohav company is proud to be a partner in a historic project – the opposite carrier to the Kinneret.

At the Zalmon site of Mekorot, 36″ diameter needle valves were installed that are used to regulate the flow and pressure of desalinated water to fill the Sea of Galilee through Zalmon river.

The project was carried out for: Mekorot

Operating contractor: Ofek Atarim 10

The opposite national carrier (HaMovil) – Site Zalmon

 Hakohav company is proud to be a partner in a historic project – the opposite carrier to the Kinneret.

At the Zalmon site of Mekorot, 36″ diameter needle valves were installed that are used to regulate the flow and pressure of desalinated water to fill the Sea of Galilee through Zalmon river.

The project was carried out for: Mekorot

Operating contractor: Ofek Atarim 10

Tavor Reservoir Project – Restoring water for agriculture

Centric butterfly valves were installed at the outlet of the Tavor Reservoir as disconnecting valves in the filter batteries before supplying the water for irrigation in the fields.

The owner of the facility – Mekorot, and the companies that produce the filtration systems, know that you can trust the valves of Hakohav.

The project was carried out for: Mekorot

Operating contractor: Shlomo Haviv

Tavor Reservoir Project – Restoring water for agriculture

Centric butterfly valves were installed at the outlet of the Tavor Reservoir as disconnecting valves in the filter batteries before supplying the water for irrigation in the fields.

The owner of the facility – Mekorot, and the companies that produce the filtration systems, know that you can trust the valves of Hakohav.

The project was carried out for: Mekorot

Operating contractor: Shlomo Haviv

Lines connecting water reservoirs – the Arava

A connecting line between Paran Reservoir and Tzofar Reservoir and a connecting line between Timna and Yotveta Reservoir.

In this line, 13.5 meter long pipes were laid for the first time.

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 32″

The length of the line: 30,000 meters

Lines connecting water reservoirs – the Arava

A connecting line between Paran Reservoir and Tzofar Reservoir and a connecting line between Timna and Yotveta Reservoir.

In this line, 13.5 meter long pipes were laid for the first time.

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 32″

The length of the line: 30,000 meters

Karnei Shomron – Kidron river project

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 42″

The length of the line: 4,000 meters

Karnei Shomron – Kidron river project

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement cement, diameter 42″

The length of the line: 4,000 meters

Yarhiv station – Karnei Shomron

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement, diameter 40″, thickness 16 mm

Line length: 1,000 meters

Yarhiv station – Karnei Shomron

The project was carried out for: Mekorot

Type of piping: Trio-wrapped steel piping and internal coating with cement, diameter 40″, thickness 16 mm

Line length: 1,000 meters

Elkana – Barkan connecting line

Expanding the reliability of the water supply to the communities located in Mount Samaria.

Connecting the water supply in Samaria to the national water system.

The route of the mountainous terrain posed a great challenge to the water line installers.

The project was carried out for: Mekorot

Piping type:

Trio-wrapped steel piping and internal coating with cement cement diameter 28″

Line length: 10,000 meters

Elkana – Barkan connecting line

Expanding the reliability of the water supply to the communities located in Mount Samaria.

Connecting the water supply in Samaria to the national water system.

The route of the mountainous terrain posed a great challenge to the water line installers.

The project was carried out for: Mekorot

Piping type:

Trio-wrapped steel piping and internal coating with cement cement diameter 28″

Line length: 10,000 meters

Upgrading sewage lines – smashing method – Moshav Ramot

In a project to upgrade existing infrastructure in Moshav Ramot, an upgrade was made to the sewage pipes in the Moshav using a unique “smashing” method, that allows the renewal of pipes without digging.
The new 225 mm Meriflex type line allows upgrading, expanding and repairing lines without digging while maintaining a normal life routine.
The project was carried out for: Kolhei Golan
Piping type: Meriflex 225 mm level 10
The length of the line: 400 meters
Operating contractor: A.D. Edri Bros.

Upgrading sewage lines – smashing method – Moshav Ramot

In a project to upgrade existing infrastructure in Moshav Ramot, an upgrade was made to the sewage pipes in the Moshav using a unique “smashing” method, that allows the renewal of pipes without digging.
The new 225 mm Meriflex type line allows upgrading, expanding and repairing lines without digging while maintaining a normal life routine.
The project was carried out for: Kolhei Golan
Piping type: Meriflex 225 mm level 10
The length of the line: 400 meters
Operating contractor: A.D. Edri Bros.

Desalination plant Sabaha Eilat

Project to upgrade and expand the “Sabaha” desalination plant in Eilat of Mekorot.
Our company installed ten riders with a diameter of 1200 for Ofek Atarim 10, which is carrying out the project.
The project was carried out for: Ofek Atarim 10 Ltd., Mekorot
Piping type: GF 1200-500 rider installation
Line length: 10 riders
Operating contractor: a team of Plassim welders

Desalination plant Sabaha Eilat

Project to upgrade and expand the “Sabaha” desalination plant in Eilat of Mekorot.
Our company installed ten riders with a diameter of 1200 for Ofek Atarim 10, which is carrying out the project.
The project was carried out for: Ofek Atarim 10 Ltd., Mekorot
Piping type: GF 1200-500 rider installation
Line length: 10 riders
Operating contractor: a team of Plassim welders

Brine line Intel-Ashkelon – Intel Kiryat Gat line

A new electronic chip factory was built at the Kiryat Gat Intel factory.
As part of the infrastructure preparation for the factory, a 450 mm diameter pipeline with a length of 15 km is laid between the Intel factory and the beach strip in Ashkelon.
The line is designed to absorb brine from the plant and transport it to the sea in drianage.
The project was carried out for: Intel
Piping type: Meriflex 450 mm level 16
The length of the line: 15,000 meters
Operating contractor: Ofek Atarim 10 Ltd

Brine line Intel-Ashkelon – Intel Kiryat Gat line

A new electronic chip factory was built at the Kiryat Gat Intel factory.
As part of the infrastructure preparation for the factory, a 450 mm diameter pipeline with a length of 15 km is laid between the Intel factory and the beach strip in Ashkelon.
The line is designed to absorb brine from the plant and transport it to the sea in drianage.
The project was carried out for: Intel
Piping type: Meriflex 450 mm level 16
The length of the line: 15,000 meters
Operating contractor: Ofek Atarim 10 Ltd

Genigar Wastewater Treatment Institute

As part of the upgrade and expansion of Genigar sewage treatment facility, lines with diameters of 710, 400 mm with a total length of 10 km were laid connecting Genigar sewage treatment facility
to Afula sewage treatment facility.
The laying of the lines included many horizontal drillings and the crossing of streams, roads and railroad tracks.
The project was carried out under the ongoing professional supervision of the field service of Plassim.
The project was carried out for: Mei Noam Corporation
Piping type: Meiflex 710 mm grade 16 and Meriflex 400 grade 16
Line length: 10,000 meters
Operating contractor: Shaham Mekorot

Genigar Wastewater Treatment Institute

As part of the upgrade and expansion of Genigar sewage treatment facility, lines with diameters of 710, 400 mm with a total length of 10 km were laid connecting Genigar sewage treatment facility
to Afula sewage treatment facility.
The laying of the lines included many horizontal drillings and the crossing of streams, roads and railroad tracks.
The project was carried out under the ongoing professional supervision of the field service of Plassim.
The project was carried out for: Mei Noam Corporation
Piping type: Meiflex 710 mm grade 16 and Meriflex 400 grade 16
Line length: 10,000 meters
Operating contractor: Shaham Mekorot

Upgrading the main collector – Elad/Nachshonim interchange

Performing an upgrade to the main collector sewage line of the city of Elad, with a 1000 mm diameter pipe.
The project includes the laying of pipelines at great depth, including horizontal drilling under Route 6.
The project was carried out under the ongoing professional supervision of the field service of Plassim.
The project was carried out for: Arim Company
Piping type: Meriflex 1000 mm grade 10
The length of the line: 3,500 meters
Operating contractor: Mei Hamek 2000

Upgrading the main collector – Elad/Nachshonim interchange

Performing an upgrade to the main collector sewage line of the city of Elad, with a 1000 mm diameter pipe.
The project includes the laying of pipelines at great depth, including horizontal drilling under Route 6.
The project was carried out under the ongoing professional supervision of the field service of Plassim.
The project was carried out for: Arim Company
Piping type: Meriflex 1000 mm grade 10
The length of the line: 3,500 meters
Operating contractor: Mei Hamek 2000